Field management
What happened on site today, captured before anyone leaves it.
Foremen record the day from a phone in the field: hours by cost code, who showed up, what got installed, what's blocking. Everything lands in the same project the office is already looking at, so nobody rekeys a paper ticket on Monday morning.
What's included
Each capability is labelled with the plan it becomes available on.
Daily project reports
StarterWeather, crew size, hours worked, work summary, delays and safety notes — with photos attached straight from the phone.
Field reports with photos and video
StarterPost an update with media from the jobsite. Anyone on the project sees it immediately, with the author and timestamp attached.
Timesheets and timecard approval
StarterCrew logs hours against a cost code. Managers approve or reject with a note, and approved hours flow into earned value.
Attendance
StarterMark the crew present, absent or on another job for any date, in bulk. Summarised by trade and by project.
Punch list
StarterLog items with location, priority, assignee and due date. Track them from open through complete to verified.
Crew assignment
StarterAssign people to a project and control what each role can reach, per project rather than only company-wide.
Materials tracking
ProfessionalFollow material from quoted through ordered, in transit, delivered and installed, tied to the cost code it belongs to.
Equipment register
ProfessionalKeep company equipment and its assignment in one list rather than a spreadsheet.
Try it on your next job
Start a free trial and set up a project in a few minutes. No card required to begin.
Start free trial